Introducing Mattermost Enterprise Advanced: multi-domain secure operations. Learn more

Sovereign Operations & AI for Critical Infrastructure and National Security

Zero-trust collaboration, automation and AI in private cloud, self-hosted, and air-gapped environments. Built for national security, critical infrastructure, and regulated enterprises: you own the data, the model, and the keys.

Runs self-hosted, private cloud, or fully air-gapped.

Mattermost channel and playbook coordinating a strategic force movement assessment

Trusted by mission-critical teams worldwide

U.S. Air Force
NASA
Fujitsu
Qualcomm
Türk Telekom
RTE
NRI

Intelligent Mission Environment

One platform for
your mission-critical operations

Integrate secure messaging and collaboration, workflow automation, task management, sovereign AI agents, and real-time communication purpose-built for critical infrastructure and national security.

Every capability runs entirely inside your perimeter, including in classified & air-gapped networks.

Secure messaging & collaboration

Full searchable history across channels, threads, and direct messages, with per-channel permissions and retention. Priority messages track who has acknowledged them. Available on web, desktop, mobile, and embedded inside Microsoft Teams.

Mattermost Airspace Anomalies channel with a high-priority alert and threaded replies

Deploy anywhere

You decide where your operations run

From sovereign public cloud to fully disconnected classified networks.

Every deployment includes the full platform.

Sovereign cloud

Azure, Oracle, Google, and AWS, in regions and tenancies you control.

On-prem / private cloud

Deploy on infrastructure your operators already trust.

Air-gapped

Fully disconnected installs for classified and restricted networks.

Hybrid / multi-region

Span sites and classification levels while keeping a single control plane.

Edge deployment

Lightweight installs on ships, vehicles, and forward operating bases. Operates fully disconnected, syncs automatically when connectivity is restored.

200,000+ concurrent users, with high and ultra-high availability clustering

NATO & US PL3, IL4/5, IL6/7 proven deployments

Layered extensibility: pre-packaged and custom integrations, webhooks, and a plugin architecture

ISO/IEC 27001
DoD IL2 to IL6
NIST 800-53 / 800-171
DISA STIG
ISO/IEC 27001
DoD IL2 to IL6
NIST 800-53 / 800-171
DISA STIG

Who we build for

Sovereign Operations and AI
for Mission-Critical Teams

Built for national security and critical infrastructure where operational control and data sovereignty are non-negotiable.

National security and public sector
  • Plan and run missions with coalition partners, often on classified networks or with limited connectivity. Use a Zero Trust application suite with messaging, playbooks, and secure mobile access that runs on infrastructure you own and federates across mission partner networks.

    National security solutions
    Military cargo aircraft in flight

  • Share intelligence and operational data across classification boundaries without physically moving data, keeping separate logins on each network, or relying on uncontrolled voice coordination. Control data spillage with access set by clearance and every channel marked with its classification.

    Intelligence solutions
    Satellite dish

  • Work across departments and agencies while every record stays in the country and is kept according to policy. Messaging, calls, and workflows run in your own jurisdiction. Retention, legal hold, and eDiscovery are built in, and shared channels connect other agencies.

    Public sector solutions
    Eiffel Tower, Paris

  • Share photos, locations, and updates as events unfold, where any message may become evidence later. Each case or incident gets its own channel with files, calls, and a response playbook, on desktop and mobile. Every action is logged for review.

    Law enforcement solutions
    Police car with emergency lights

Military cargo aircraft in flight
Critical infrastructure and regulated enterprise
  • Keep control rooms and field crews coordinated when a cyber attack or grid fault takes down corporate IT. Mattermost runs separately from your corporate systems. Monitoring alerts open incident channels, playbooks guide each response, and crews send photos and status from the field.

    Energy solutions
    Power transmission towers

  • Resolve trading and security incidents while every minute costs money, and keep the full record regulators expect. Alerts open an incident channel and start a playbook with the right sign-offs. Every message is archived, with legal hold and export to Proofpoint or Global Relay.

    Financial services solutions
    Financial district towers

  • Respond together across plant, engineering, and security teams when a line or OT system raises an alert, without exposing design IP. Alerts post to shared channels through webhooks and APIs, and follow-up is tracked on boards. Files and messages stay on your own servers.

    Manufacturing solutions
    Industrial robot arm in a factory

  • Coordinate engineers across dozens of tools, and keep responding when an outage or breach takes those tools down. CI/CD, scanner, and SIEM events post to channels and start playbooks. Jira, GitHub, and ServiceNow stay in sync, and Mattermost stays up when primary systems go down.

    Technology solutions
    Code on a monitor

Power transmission towers

See Mattermost in your environment

A specialist will walk you through deployment, access controls, and AI options for your networks and your mission.

Contact
Demo